NonStop S-Series Planning and Configuration Guide (G06.29+)

HP NonStop S-Series Planning and Configuration Guide523303-021
12-1
12 Site Planning and Preparation
This section provides information you need to plan and prepare the site for a NonStop
S-series system.
Site planning is a crucial step in ensuring the smooth installation of new equipment.
Before you install a new system:
1. Select the room or rooms your system will occupy and assign the floor space for
the system, peripheral devices, and office furniture.
2. Ensure that the necessary data communications lines are installed.
3. Plan for the installation of system consoles.
4. Ensure that the proper power sources are installed.
5. Ensure that the environmental requirements of the system are met.
6. Prepare the delivery route.
Related Sources
These sources can provide guidelines for site planning:
Your HP trained service provider
Local laws and regulations
If you are planning for ServerNet clusters, the ServerNet Cluster Manual
Related Sources 12-1
Selecting the Rooms and Assigning Floor Space 12-2
Planning for Data Communications 12-3
Planning for System Consoles 12-5
Planning for System Power 12-6
Meeting the Environmental Requirements 12-10
Preparing the Delivery Route 12-13