NonStop S-Series Planning and Configuration Guide (G06.29+)

Site Planning and Preparation
HP NonStop S-Series Planning and Configuration Guide523303-021
12-13
Other Factors
Other Factors
Other environmental factors to consider include:
Site cleaning and maintenance
Ergonomics and human factors
Acoustic noise control
Computer-room lighting
Computer-room security
Preparing the Delivery Route
Before your system arrives, you must prepare the delivery route to the computer
rooms. HP recommends that you move the equipment on its shipping pallet into the
room in which it will be installed before unpacking the shipping container. Make sure
that the paths and doorways are clear and wide enough for the enclosures on their
shipping pallets, the shipping containers, and the equipment used to transport them.
Make sure that the elevators can carry the weight of the enclosures, shipping
containers and shipping pallets, moving equipment, and movers. The dimensions and
weight of system enclosures are listed in Enclosure Dimensions on page B-7 and
Weights for System Enclosures on page B-10.