NonStop S-Series Planning and Configuration Guide (G06.29+)

Raised floor, if necessary, including cable cutouts
Air conditioning
Adequate lighting
Fire and safety provisions
Electrical outlets for system enclosures
Electrical outlets for subsystems or peripheral devices
Electrical utility outlets
Direct communication line for the system console modem
Communications lines for other modems
Data communications lines and local area network wiring
Work area available near the installation site for unpacking equipment
Installation site is clear objects and debris
Delivery route, including door and hallway clearance, elevators
Personnel to help move equipment (two are required to move double-high stacks)
Equipment to move shipping pallets
Heavy freight handling equipment
Safety eye glasses
Scissors or cutters to cut banding straps
Phillips screwdriver
Stubby Phillips screwdriver
Small slotted screwdriver
3/4-inch (19-mm) open end wrench (system enclosure legs)
15/16-inch (24-mm) open end wrench (modular storage system pedestal legs)
Labels and pens to mark cables
Required tools:
System Name
/ /
Date
Final Planning Checklist
VST961.vsd