NonStop S-Series Planning and Configuration Guide (G06.29+)

Index
HP NonStop S-Series Planning and Configuration Guide523303-021
Index-13
S
Service processors (SPs) (continued)
peer service processors 4-46
PMCUs 4-8
power failures 10-7
Service side
See also specific components
group ID label 4-3
group service LED 4-18
IOMF CRUs 4-49
module ID label 4-18
PMF CRU 4-31
SEBs 4-18
ServerNet adapters 4-25
slots in 4-16
Setup configuration
cable connections 11-7
security 11-7
to system console 8-19
Shutdown files
automating 15-11
sequence of 15-11
Side panel, enclosure 4-61
Signal reference grid 7-2, 7-12, 12-7
Simple Network Management Protocol
(SNMP) 1-44, 4-66
Single-mode fiber-optic (SMF) PIC 4-21
Site planning
additional resources 12-1
summary 12-1
Site selection, considerations for 12-2
Slots
51 and 52 4-30
memory 4-38
ServerNet 4-29
SLSA subsystem manager E-4
SMB 4-45
SMF PIC
cable distances 4-21
in an IOMF 2 CRU 4-54
in an MSEB 4-21
Smoke detectors, installing 12-11
SNMP 1-44, 4-66
Software product revisions (SPRs), and
planned outages 15-2
SPRs and planned outages 15-2
SPs
See Service processors (SPs)
Stackable enclosure
See System enclosures
Startup files
automating 15-10
invoking 15-10
sequence of 15-10
TCP/IP stacks 15-10
Status LEDs
See LEDs
Storage CRUs
See Disk drives
Storage subsystem E-4
Subnet
defined 11-9
nodes on 11-9
Subnet addressing 1-48
Subnet masks 1-48
Subsystem Control Facility (SCF)
See SCF
Subsystem managers 15-5
Support and Service Library 1-30
Support planner, functions of 9-2
SWAN 2 concentrator
manuals 4-68
SWAN concentrators
adding 9-15
changing the configuration of 9-15
factory-default configurations 8-16
LAN planning for 11-2
manuals 4-68