NonStop S-Series Planning and Configuration Guide (G06.29+)

Contents
HP NonStop S-Series Planning and Configuration Guide523303-021
vii
7. Enclosure Arrangements and Cable
Connections (continued)
7. Enclosure Arrangements and Cable Connections (continued)
Power-On Cables 7-10
Powering On 7-12
Powering Off 7-12
Requirements for Grounding 7-12
Considerations for Expanding a System 7-13
8. Initial Configurations
Processor Numbers and Locations 8-2
Processor Types and Memory Sizes 8-3
Internal Disk Drives 8-4
Supported Internal Disk Drives 8-4
Disk Drives for 16-GB Processors 8-4
Disk Drive Enclosure 8-4
Minimum Disk-Drive Configuration 8-5
Locations of $DSMSCM and $AUDIT as Mirrored Volumes 8-5
Other Internal Disk Drives 8-5
External Disk Drives 8-6
Tape Drives 8-6
Virtual TapeServer 8-6
Tape Drives for 16-GB Processors 8-6
Initial Default Values for System Attributes 8-7
Changing System Name and Number 8-9
Initial Configuration Files 8-9
Objects Configured in the Initial CONFIG File 8-10
Objects That Must Not Be Renamed 8-11
Command Files for Objects Not Configured in the Initial CONFIG File 8-12
Files Used to Create the Initial CONFIG File 8-12
CONFBASE File 8-13
Naming Conventions Used in the SCF0000 File for SCF Objects 8-14
SCF Commands to Automate Disk Configuration 8-15
OSM Configurations 8-16
SWAN Concentrator Configurations 8-16
Ethernet Ports on PMF CRUs and IOMF CRUs 8-16
ServerNet Adapter Configurations 8-17
Factory-Default Configuration of MFIOBs 8-17
Initial IP Addresses for System and System Consoles 8-18
IOAM Enclosures 8-19