NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Expanding a System Online
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
6-37
24. Reload Processors in Block If Necessary
24. Reload Processors in Block If Necessary
Skip this step if the added block does not contain a processor enclosure.
1. Start a TACL session and log on as a super-group user.
2. At the TACL prompt:
>RELOAD (m,n), PRIME
where m and n are the processor numbers in the block you just added.
Processor numbers are assigned according to group number:
In this example, you reload the processors in group 04:
If the Added Block Contains … Then …
One I/O enclosure and no
processor enclosures
Skip this step. Go to 25. Verify Operations in Added
Block on page 6-38.
A processor enclosure, with or
without I/O enclosures
Perform this step.
Note. Ensure you have KMSF swap files of the proper size and location available on the donor
system after the reduction is finished. Otherwise, applications and processes on the newly
resized system might terminate. For information about KMSF swap files and their
recommended sizes, see the Kernel-Managed Swap Facility (KMSF) Manual.
In group … The processors are … In group … The processors are …
01 0,1 05 8,9
02 2,3 06 10,11
03 4,5 07 12,13
04 6,7 08 14,15
TACL 1>RELOAD (6,7), PRIME