NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

HP NonStop S-Series System Expansion and Reduction Guide—522465-009
C-1
C Checklists and Worksheets
This appendix contains checklists and worksheets for planning system resizing.
Copy these worksheets and staple them together. You might need more than one copy
of some worksheets. The checklists say which worksheets to copy more than once.
Note. These worksheets show the maximum number of I/O enclosures. Your service provider
can tell you the number of I/O enclosures supported by the RVU on your system.
Note. The diagrams in this guide identify all ServerNet expansion boards as SEBs. Your
system might have or require modular ServerNet expansion boards (MSEBs) in the slots
designated for SEBs. SEBs and MSEBs are functionally equivalent.
Caution. ServerNet cabling for IOAM enclosures is different from the cabling shown in the
topology diagrams in this appendix. Only service providers trained by HP should perform
cabling of IOAM enclosures.
Sheet Title Purpose
Checklist Tools and Supplies Show tools and supplies for resizing
Checklist Preliminary Procedures Show how to prepare your site and
system for resizing
Worksheet 1 OSM, TSM, System Information,
and SP Firmware
Record OSM, TSM, service processor,
and system information for target and
donor systems (if applicable)
Worksheets
2.1 through
2.8 (2.n)
Groups 0n - nn Record information about all groups in
target and donor systems (if applicable)
Worksheet
2.1a
For IOAM Enclosures Record information about IOAM
enclosures in target and donor systems
Worksheet 3 Added Blocks —
Tetra 8 Topology, X Fabric
Show on each fabric:
•
The configuration of your target
system before resizing
•
Where to place added enclosures
•
What the group numbers will be for
the added enclosures
Worksheet 4 Added Blocks —
Tetra 8 Topology, Y Fabric
Worksheet 5 Added Blocks —
Tetra 16 Topology, X Fabric
Worksheet 6 Added Blocks —
Tetra 16 Topology, Y Fabric
Worksheet 7 Block to Be Added Record information about the block
being added
Worksheet 8 Reduction: Hardware Inventory,
Group # _____
Record information about components
and processes in the enclosure to be
removed
Worksheet
8a
Reduction: Hardware Inventory,
IOAM Enclosure, Group # ____
Record information about components
and processes in an IOAM enclosure to
be removed