NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

About This Guide
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
xiv
Guided Replacement Procedures
Guided Replacement Procedures
This guide refers to the guided replacement procedures. These automated tools guide
you step by step through replacing many customer-replaceable units (CRUs).
Guided procedures are part of the HP Open Systems Management (OSM) package
and the Compaq TSM package. OSM is the system management tool of choice for HP
NonStop S-series systems.
OSM Guided Procedures
In OSM, guided procedures are launched by actions within the OSM Service
Connection. To access the OSM guided replacement procedures:
1. Log on to the OSM Service Connection.
2. Locate and right click on the object in the Tree pane.
3. Select Actions.
4. Select Replace from among the available actions for that resource.
5. Click Perform action; the action launches the guided procedure.
See to the OSM User’s Guide for a list of the OSM guided procedures.
TSM Guided Procedures
To access the TSM guided replacement procedures:
Start > Programs > Compaq TSM > Guided Replacement Tools
Note. The Guided Replacement Toolkit (GRT) is used to replace and an IOMF, PMF, power
supply, or 6760 ServerNet Device Adapter (ServerNet/DA) in a system running TSM product
version T7945AAW (shipped with the G06.12 RVU) or earlier.