- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Safety and Compliance
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
Statements-8
Forbrugersikkerhedsmeddelelser
Forbrugersikkerhedsmeddelelser
Installation og service af udstyr der udføres af kunden
De følgende meddelelser vedrører sikkerheden angående installation og service af
udstyr, der udføres af kunden, som beskrives i denne brugerhåndbog.
•
Hold lugen lukket under normal drift.
•
Batterierne skal kasseres i overensstemmelse med lokale vedtægter.
Forsigtig! Når du har afbrudt ventilatorens netkabel fra PMCU'en, skal du vente til
ventilatoren standser helt, før du udfører det næste servicetrin.
Forsigtig! Pas på, at du ikke taber monteringsskruerne ned i ventilatoren.
ADVARSEL! Tilslut ikke ventilatorens netkabel indtil efter, at du har monteret ventilatoren.
Ventilatorvingerne begynder at dreje, så snart ventilatorens netkabel tilsluttes PMCU'en.
ADVARSEL! Berør ikke jævnstrøms forbindelsesstikket på S7400/S7600/Sxx000
PMF-enheden, der kan udskiftes af kunden, når du har afbrudt jævnstrøms netkablet fra
enheden, der kan udskiftes af kunden. Der er risiko for alvorligt stød i op til 15 sekunder efter,
at kablet afbrydes. Du kan sikre dig, at det er sikkert at fjerne enheden, der kan udskiftes af
kunden, ved at teste den (med et voltmeter), før du berører stifterne på jævnstrøms
forbindelsesstikket.