- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Safety and Compliance
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
Statements-15
Meddelanden beträffande konsumentsäkerhet
Meddelanden beträffande konsumentsäkerhet
Kundutförd installation och service
De följande meddelandena beskriver säkerhetsföreskrifter för kundutförd installation
och service av utrustning som beskrivs i denna manual:
•
Dörren skall vara stängd under normal drift.
•
Batterier måste kasseras i enlighet med lokala förordningar.
Observera! När du kopplat ur nätsladden till fläkten från PMCU-enheten måste du vänta tills
fläktbladen har stannat innan du utför nästa servicemoment .
Observera! Se till att du inte tappar monteringsskruvarna in i fläkten.
VARNING! Fläktbladen börjar snurra så snart fläktens nätsladd ansluts till PMCU-enheten. Du
ansluter nätsladden till fläkten efter det att du har monterat fläkten.
VARNING! Likströmskontakten som är placerad på S7400/S7600/Sxx000 PMF-enheten är
strömförande upp till femton (15) sekunder efter att elkablen till enheten har blivit urkopplad.
Du skyddar dig från strömstötar genom att testa om likströmskontakten fortfarande är
strömförande (med hjälp av en voltmätare).