NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Index
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
Index-2
E
Deleting (continued)
LIFs D-9
PIFs D-9
processes 4-9/4-10, D-3
SACs D-9
DHCP server 6-14
Disabling batteries 4-11
Disks
not automatically configured 7-13
stopping D-2/D-5
Documentation, manual abstracts -xv
Donor system
deleting devices and processes 4-9
description 3-1, 4-2
preparation 4-2/4-18
saving configuration 4-17
worksheet packet 4-2
worksheets C-1
E
E4SA
See also ServerNet adapter
connections 4-7
processes 4-7
removing D-6
stopping D-6/D-8
subsystems D-1
Emergency power-off (EPO) cables
See EPO cables
EMS event stream connection 4-17
Enclosure
See also Block, Removing Enclosures
adding offline 4-18
adding online 6-1/6-38
inventory 4-7
powering off 6-23
slots 50 and 55 remain unlisted 7-11
Enterprise Storage System (ESS) 1-2, 1-8
EPO cables
required 1-9
Ethernet 4 ServerNet adapter (E4SA)
See E4SA
Ethernet cables
disconnecting 6-27
planning 1-8
system console 7-8
Event numbers
1026 7-16
1027 7-16
1028 7-16
1029 7-16
1030 7-16
1031 7-16
1032 7-9, 7-16
1033 7-9, 7-16
1034 7-16
1035 7-16
1037 7-16
1040 7-16
1041 7-16, 7-17
1042 7-16
1045 7-17
1047 7-17
1048 7-17
110 7-15
111 7-15
112 7-15
2001 7-17
2004 7-17
2005 7-17
501 7-15
502 7-15
503 7-15
504 7-15
601 7-9, 7-15