NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Index
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
Index-8
T
System serial number
donor system 4-4
target system 6-6
System time, setting 5-1
System type
donor system 4-4
target system 6-6
T
TACL
adding block 6-9
CLCI connection 4-17
commands
RELOAD 6-37
, 7-10
STATUS 4-8, 6-9, D-8
configuration of CRUs 6-32
does not start 7-12
IP addresses 6-11
process lists D-3
processor reload 6-37
save configuration 4-3
startup 4-8, 4-17, 7-12, A-9
system reduction 4-8
Tandem Advanced Command Language
(TACL)
See TACL
Tape drives 4-7
Target system
description 6-6
saving configuration 6-10
worksheets 6-6
Tetrahedron 2-2
Time, setting 5-1
Tools and supplies 6-4
Topology
caution 6-3
changing 1-5
choosing 1-5
configuring 6-22
considerations 6-22
Topology (continued)
description 1-5
diagrams B-1
does not appear 7-14
donor system 4-4, 4-5, 6-7
enclosure 6-22
reconfiguring 6-3
worksheets C-1
Troubleshooting 7-2/7-17
TSM
determining versions 4-3
TSM client software
upgrading 4-2
, 6-19
verifying A-7
TSM Low-Level Link Application
shutting down A-8
starting A-9
TSM ReadMe file 4-3, 6-3, 6-5
TSM Service Application A-9
TSM workstation
configuring 6-19
connecting 6-26
disconnecting 6-27
moving 1-7, A-8
verifying 6-18
V
Versions
OSM Client A-7
TSM Client A-7