NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

Planning System Reduction
HP NonStop S-Series System Expansion and Reduction Guide—522465-009
3-13
Example Using the ServerNet Worksheets
5. Circle the Affected Enclosures
After you have traced all possible communication paths, you can see the enclosures
that will be affected by enclosure removal. Circle those enclosures. You must prepare
to remove these parts of your system.
The following example worksheet shows that you circle group 02 because you are
planning to remove it. Because group 02 has I/O enclosures connected to it, circle
those I/O enclosures as well. Group 02 also provides the communication paths to
group 06 and its associated I/O enclosures, so circle those enclosures as well.
The enclosures you must prepare for the removal procedure are:
Stop any system-critical processes or devices that are located in those enclosures, or
move these processes and devices to enclosures that will remain in the system.
Caution. If your tracing of communication paths is incomplete or incorrect, the procedure you
follow in Section 4, Reducing a System Online, might remove more enclosures than you
intended.
Processor Enclosure Groups I/O Enclosure Groups
02 21, 22, 23, 24, 25
06 61, 62, 63, 64, 65, 66