NonStop S-Series System Expansion and Reduction Guide
Table Of Contents
- NonStop S-Series System Expansion and Reduction Guide
- What’s New in This Guide
- About This Guide
- 1 The Resizing Process
- 2 Planning System Expansion
- 3 Planning System Reduction
- 4 Reducing a System Online
- 1.Prepare the Donor System for Reduction
- 2.Record Information About the Donor System
- 3.Prepare Both ServerNet Fabrics
- 4.Inventory Enclosures to Be Removed
- 5.Prepare and Stop Devices and Processes
- 6.Ensure Devices and Processes Are Stopped
- 7.Delete Devices and Processes If Necessary
- 8.Prepare Enclosures for Removal
- 9.Finish the Reduction
- 10.Remove Other Cables From Powered-Off Enclosures
- 11.Physically Remove Enclosures From the System
- Adding Enclosures to Another System
- 5 Reducing a System Offline
- 6 Expanding a System Online
- Preparation for Online Expansion
- 1.Prepare Target System for Expansion
- 2.Record Information About Target System
- 3.Prepare Target System for Addition of Block
- 4.Save Current Target System Configuration
- 5.Copy SP Firmware File From the Target System to the System Console
- 6.Finish Gathering Information
- 7.Connect a System Console to the Enclosure
- 8.Change Group Number of Enclosure to 01
- 9.Power On Enclosure
- 10.Verify Connection Between System Console and Enclosure
- 11.Configure System Console and Enclosure
- 12.Verify SP Firmware Is Compatible
- 13.Update SP Firmware in Enclosure If Necessary
- 14.Configure Topology of Enclosure If Necessary
- 15.Power Off Enclosure
- 16.Repeat Steps 6 Through 15 If Necessary
- 17.Assemble Enclosures Into a Block
- 18.Change Group Numbers of Block to Fit Target System
- 19.Disconnect System Console From Block
- 20.Power On Added Block
- 21.Cable Block to Target System
- 22.Verify Resized Target System
- 23a.Update Firmware and Code in Block (Using TSM)
- 23b.Update Firmware and Code in Block (Using OSM)
- 24.Reload Processors in Block If Necessary
- 25.Verify Operations in Added Block
- 26.Configure CRUs in Added Block
- 7 Troubleshooting
- A Common System Operations
- Determine the Processor Type
- Determine the ServerNet Fabric Status
- Determine the Product Versions of the OSM Client Software
- Determine the Product Version of the TSM Client Software
- Move the System Console
- Stop the OSM or TSM Low-Level Link
- Start a Startup TACL Session
- Start the OSM or TSM Low-Level Link
- Start the OSM Service Connection or TSM Service Application
- B ServerNet Cabling
- C Checklists and Worksheets
- D Stopping Devices and Processes
- Safety and Compliance
- Glossary
- Index

HP NonStop S-Series System Expansion and Reduction Guide—522465-009
5-1
5 Reducing a System Offline
This section describes the procedure for removing enclosures offline.
Reducing a system offline is removing enclosures from a donor system after you have
shut down the entire system. You can do this on any RVU. For systems running an
RVU earlier than G06.04, this is the only way to reduce a system.
The procedure for reducing your system offline is:
When you finish the offline removal of enclosures from the donor system, you are
ready to expand the target system. Proceed to Section 6, Expanding a System Online.
Step As Described In Page
1. Gather all information and
prepare your system.
1. Prepare the Donor System for Reduction
2. Record Information About the Donor System
4. Inventory Enclosures to Be Removed
5. Prepare and Stop Devices and Processes
6. Ensure Devices and Processes Are Stopped
7. Delete Devices and Processes If Necessary
4-2
4-4
4-7
4-8
4-9
4-9
2. Power off your system by
powering off each enclosure.
8.9 Verify Enclosures Are Removed From
System Configuration
4-18
3. Remove enclosures. NonStop S-Series Service Provider Supplement
4. Use the OSM or TSM
Low-Level Link to load the
reduced donor system.
Note. When you power your system on again, you might need to reset the system time. For
the procedure, see the SCF Reference Manual for the Kernel Subsystem.