OSI PICS Manual

ISO 8327, Version 1 for OSI/AS
Tandem OSI PICS Manual135046
8-8
F.7 Elements of Procedures Related to SPDUs
F.7 Elements of Procedures Related to SPDUs
F.7.0 Guidance for Completion
Note on GT and PT SPDUs
The use of GT and PT SPDUs in the following tables is implicitly dependent on the
associated functional unit.
Note on D Column
As protocol elements, SPDUs are considered in both directions:
A “sending SPDU” item is marked as not-mandatory (“o”) if this feature is attached:
either to a not-mandatory protocol mechanism
or to a free behavior of the SS-user
A “receiving SPDU” item is marked as not-mandatory (“o”) if this feature:
either is attached to a not-mandatory protocol mechanism
or is an SS-user confirmation associated to a free SS-user request sending
(marked as not-mandatory)
F.7.1 Kernel Functional Unit Procedures
F.7.1.1 Sending
F.7.1.1.1 Sending by Initiator
SPDU Procedure D I SS-Primitive
1 Connect (CN) m Y S-CON-req
2 Connect Data Overflow (CDO) c1
S-CON-req
3 Finish (FN) o Y S-REL-req
4 Disconnect (DN) o Y S-REL-rsp
5 Abort (AB) m Y S-U-AB-req
6 Abort Accept (AA) o N
7 Data Transfer (DT) o Y S-DATA-req
c1: If F.3/1 = 1 then — else o