OSI PICS Manual
Contents
Tandem OSI PICS Manual–135046
xii
9. ISO 8327, Version 2 for OSI/AS (continued)
9. ISO 8327, Version 2 for OSI/AS (continued)
F.7.5 Expedited Data Functional Unit Procedures 9-9
F.7.6 Typed Data Functional Unit Procedures
9-9
F.7.7 Capability Data Functional Unit Procedures
9-10
F.7.8 Minor Synchronize Functional Unit Procedures
9-10
F.7.9 Major Synchronize Functional Unit Procedures
9-10
F.7.10 Resynchronize Functional Unit Procedures
9-10
F.7.11 Exceptions Functional Unit Procedures
9-11
F.7.12 Activity Management Functional Unit Procedures
9-11
F.8 Supported SPDU Parameters
9-12
F.8.0 Guidance for Completion
9-12
Note on D Column
9-12
Note (N1) : User-Data-Like Parameters
9-12
Note on Value Column
9-12
F.8.1 Connect (CN) SPDU
9-12
F.8.2 Overflow Accept (OA) SPDU
9-13
F.8.3 Connect Data Overflow (CDO) SPDU
9-13
F.8.4 Accept (AC) SPDU
9-13
F.8.5 Refuse (RF) SPDU
9-14
F.8.6 Finish (FN) SPDU
9-15
F.8.7 Disconnect (DN) SPDU
9-15
F.8.8 Not Finished (NF) SPDU
9-15
F.8.9 Abort (AB) SPDU
9-16
F.8.10 Abort Accept (AA) SPDU
9-16
F.8.11 Data Transfer (DT) SPDU
9-16
F.8.12 Expedited Data (EX) SPDU
9-16
F.8.13 Typed Data (TD) SPDU
9-16
F.8.14 Capability Data (CD) SPDU
9-17
F.8.15 Capability Data Ack (CDA) SPDU
9-17
F.8.16 Give Tokens (GT) SPDU
9-17
F.8.17 Please Tokens (PT) SPDU
9-17
F.8.18 Minor Sync Point (MIP) SPDU
9-18
F.8.19 Minor Sync Ack (MIA) SPDU
9-18
F.8.20 Major Sync Point (MAP) SPDU
9-18
F.8.21 Major Sync Ack (MAA) SPDU
9-18
F.8.22 Resynchronize (RS) SPDU
9-19
F.8.23 Resynchronize Ack (RA) SPDU
9-19
F.8.24 Prepare (PR) SPDU
9-19
F.8.25 Exception Report (ER) SPDU
9-19