OSI PICS Manual

CCITT X.400: P1 1988 for MHS
Tandem OSI PICS Manual135046
15-7
A.3 Instructions for Completing the PICS Proforma
In the “I” (Implemented) column the declarations of implementation shall be stated and
shall be completed by the supplier using a symbol chosen from the following list:
p11 = A.5.4.20.O
p12 = A.5.4.20.R
p13 = p9 or p14
p14 = A.5.4.16.R
p15 = A.5.4.16.O
p16 = A.5.4.25.O
p17 = A.5.4.25.R
p18 = p1 or p17 or A.5.4.29.R
p19 = A.5.7.3.1.1.5.O
p20 = A.5.4.32.R
p21 = A.5.4.32.O
p22 = A.5.7.3.1.1.11.10.O
p23 = “the MTA acts within a PRMD
p24 = A.5.4.2.R
p25 = p1 or p9 or p17
p26 = p25 or p7
Symbol Meaning
y Item is supported by the implementation.
n Item is not supported by the implementation
Item is not applicable.
Note.
1. Parameters which are not supported for Reception should not be regarded as a protocol
violation. This note is for further study!!!
2. In the following tables, every leading parameter marked “m” should be supported by the
IUT in order to fulfill the static conformance requirements. Sub-parameters marked “m”
should be supported if the corresponding leading parameter is supported by the IUT.
3. In the columns marked “PERMIT. RANGEOF VALUES”, the maximum length and
maximum number of occurrences have been stated according to the standard. The
minimum and maximum lengths and numbers of occurrences should be entered for
originator and the maximum length and number of occurrences in reception.