OSI PICS Manual
ISO 8073 for OSI/TS
Tandem OSI PICS Manual–135046
5-23
D.15.5 Expedited Data Transport Service
Is use of extended format selected in CC, when it has been proposed in CR, supported
with preferred class:
D.15.5 Expedited Data Transport Service
Is use of expedited data proposed in CR TPDU supported when preferred class is?
Is use of expedited data selected in CC, when it has been proposed in CR, supported
with preferred class?
D.15.6 Non-Use of Checksum ((C4 or C4L) AND T4F29::)
D.15.7 Non-Use of Explicit Flow Control (C2 AND T2F20::)
Index Extended Format References Status Support
NEF4 Class 2 6.5.4 k) O Conf
NEF5 Class 3 6.5.4 k) O Conf
NEF6 Class 4 6.5.5 k)
6.5.5 j)
O Conf
Index Expedited Data References Status Support
TED1 Class 1 6.5.4 r) O Conf
TED2 Class 2 6.5.4 r) O Conf
TED3 Class 3 6.5.4 r) O Conf
TED4 Class 4 6.5.4 r)
6.5.5 m)
O Conf
Index Expedited Data References Status Support
TED5 Class 1 6.5.4 r) O Conf
TED6 Class 2 6.5.4 r) O Conf
TED7 Class 3 6.5.4 r) O Conf
TED8 Class 4 6.5.4 r)
6.5.5 m)
O Conf
Index Non-Use of Checksum References Status Support
NUC1 Is non-use of checksum proposed in CR 6.5.4 m)
6.5.5 k)
OConf
NUC2 Is non-use of checksum selected in CC when it has
been proposed in CR
6.5.4 m)
6.5.5 k)
OConf
Index Non-Use of Explicit Flow Control References Status Support
NUF1 Is non-use of explicit flow control proposed in CR 6.5.4 p) O No
NUF2 Is non-use of explicit flow control selected in CC
when it has been proposed in CR
6.5.4 p) O No