OSM Migration Guide (G06.29+)
Getting Started With OSM Applications
OSM Migration Guide—527273-018
5-5
Functional Differences
Figure 5-3 illustrates how to power off a set of External Disks with a single action. After 
you select External Disk as the resource type and Power Off as the action, click the 
Add or Add All buttons to move the specific disks that you want to power off from the 
upper to the lower resource list. Click Perform Action to initiate the Power Off action. 
The Progress bar and the circle to the left of each disk resource indicate the status of 
the action on each resource (whether the action has completed on that resource, 
whether it succeeded or failed). Click Action Summary to get more information about 
actions that fail.
The red arrow indicates where you can click and drag to resize so you can view more 
of the upper or lower portion of the dialog box. You can also resize the entire Multi-
Resource Actions dialog box.
Figure 5-3. Preparing to Perform an Action on Multiple Objects 










