OVNPM 1.5.2 - Performance Agent for NonStop Display Agent Guide

Using Views: SystemInsight 75
6-7-6 Changing Metrics Used to Plot the Line at Any Time
Follow the steps to Change the Metrics Used to Plot the Line at Any Time:
1. Open the view and select the Plot display mode
2. From the view window Plot menu, select the Metrics option. The Metrics dialog box is displayed.
Figure 6-14 Metrics Dialog Box
3. Select the metrics to the new line using the Y and X drop-down boxes.
4. Click on the OK button to complete the procedure.
You can see estimates of the X and Y values for any point on the line by clicking it. A vertical index line appears
and the estimates are displayed in the legend box preceded by E.
You can shift the index to another position, either by clicking on another point or by dragging the vertical line
with the left and right cursor keys.
Using Views: SystemInsight