RDF System Management Manual

Table Of Contents
Contents
HP NonStop RDF System Management Manual524388-003
viii
14. Process-Lockstep Operation
RDF Takeovers Within a Network Environment 13-6
Takeover Phase 1 – Local Undo 13-6
Takeover Phase 2 – File Undo 13-6
Takeover Phase 3 – Network Undo 13-7
Takeover Phase 3 Performance 13-7
Communication Failures During Phase 3 Takeover Processing 13-8
Takeover Delays and Purger Restarts 13-8
Takeover Restartability 13-8
Takeover and File Recovery 13-8
The Effects of Undoing Network Transactions 13-9
Takeover and the RETAINCOUNT Value 13-12
Network Configurations and Shared Access NonStop SQL/MP DDL
Operations 13-13
Network Validation and Considerations 13-13
RDF Re-Initialization in a Network Environment 13-14
Network Master Subsystem Initialization 13-14
Non Network Master Subsystem Initialization 13-14
RDF Networks and ABORT or STOP RDF Operations 13-15
RDF Networks and Stop-Update-to-Time Operations 13-15
Sample Configurations 13-16
Sample Network Master Configuration 13-16
Sample Non Network Master Configuration 13-18
RDFCOM STATUS Display 13-19
14. Process-Lockstep Operation
Starting a Lockstep Operation 14-2
The DoLockstep Procedure
14-2
Including the DoLockstep in COBOL85 Applications
14-2
Invoking DoLockStep by way of TAL 14-3
DoLockStep Execution 14-3
The Lockstep Transaction 14-4
RDF Lockstep File 14-4
Multiple Concurrent Lockstep Operations 14-5
The Lockstep Gateway Process 14-6
NAME 14-6
PROGRAM 14-6
STARTUPMSG 14-6
AUTORESTART 14-6
Disabling Lockstep 14-7