RDF/IMP, IMPX, and ZLT System Management Manual

Network Transactions
HP NonStop RDF/IMP, IMPX, and ZLT System Management Manual524388-002
13-14
Non Network Master Subsystem Initialization
Non Network Master Subsystem Initialization
If you reconfigure the RDF subsystem of a non network master:
1. The network configuration record must point to the network master of the RDF
network.
2. You must ensure that the updater responsible for the PNETTXVOLUME is also
configured to the same image trail as that listed in the network master’s network
configuration record. Otherwise, validation will fail and you will be unable to start
the newly configured subsystem.
RDF Networks and ABORT or STOP RDF
Operations
If no network transactions are active, you can stop RDF on any subsystem at any time
without affecting the other systems in an RDF network. The same is true with regard
to an RDF monitor process aborting its RDF subsystem.
There is, however, one exceptional situation. The RDFNET process runs on the
network master’s primary system. For every primary system in the RDF network, the
RDFNET process maintains a special file on its PNETTXVOLUME volume. If the
communications line to one of those primary systems is down, and you then issue a
STOP RDF command on the network master’s primary system, the STOP RDF
command could appear to hang. The reason for this is that the RDFNET process
might be trying to open a file for the system whose path is down. In such a case, the
RDFNET process waits until either the line comes back up or the Expand level-4 timer
expires. If the RDFNET process must wait for the the Expand level-4 timer to expire, it
will not be able to respond to the STOP RDF or abort RDF request until the timer
expires. By default, the timer is four or five minutes.
If you are waiting for the network master subsystem to shut down, and the operation
does not appear to be happening, check the communication lines to the other systems
in the network. If one of them is down and the RDFNET process is tying up the orderly
shutdown of RDF, stop the RDFNET process manually.
Note. If you must change the PNETTXVOLUME, the ImageTrail, or the RDFVOLUME of any
subsystem in your RDF network, then you must stop and reinitialize all of the RDF subsystems
in that network.
Caution. If you stop any RDF subsystem in an RDF network, you could lose large amounts of
committed data in the event of an unplanned outage.