ServerNet Cluster 6770 Hardware Installation and Support Guide
Index
ServerNet Cluster 6770 Hardware Installation and Support Guide—522544-002
Index-2
L
L
Labeling cables 6-1
LED
for ports on ServerNet II Switch 8-7
for X fabric ServerNet II Switch 8-7
for Y fabric ServerNet II Switch 8-7
power for ServerNet II Switch 8-7
yellow fault on ServerNet II Switch 8-7
M
Modular ServerNet Expansion Boards
(MSEBs)
connections to 1-14
description 1-5
PICs 1-5
verifying the installation of f 3-1
Monitor port
on ServerNet II Switch 1-9
on UPS 1-11
Monitoring
a UPS 8-10
an AC transfer switch 8-16
MSEBs
see Modular ServerNet Expansion
Boards (MSEBs)
N
Nodes, verifying connections 8-20
NonStop Cluster Switch
See ServerNet Cluster Switch
NonStop Himalaya Cluster Switch
See ServerNet Cluster Switch
P
PICs
MSEBs 1-5
ServerNet II Switch 1-9
Planning for
cable connections 2-12
EIA standard rack-mount 2-10
power 2-16
ServerNet Cluster Switch
enclosures 2-10
Port
LEDs on ServerNet II Switch 8-7
monitor 1-9
monitor on UPS 1-11
remote emergency power off (EPO) on
UPS 1-11
Power
LED for ServerNet II Switch 8-7
planning for 2-16
Powering on
a ServerNet Cluster Switch 7-2
a ServerNet II Switch 7-5
a UPS 7-4, 7-6, 7-7
Power-monitor cables
function 1-13
preinstalled for enclosure
configuration 4-1
Problems, collecting information 8-1
Processor status, verifying 3-4
R
Rack-mount
configuration 1-7
planning for 2-10
Recovery procedures 8-22
Remote emergency power-off (EPO)
connecting 7-3
description 1-11