ServerNet Cluster 6770 Hardware Installation and Support Guide
Planning for the ServerNet Cluster Switch
ServerNet Cluster 6770 Hardware Installation and Support Guide—522544-002
2-4
Required Hardware
Required Hardware
MSEBs must be installed in slots 51 and 52 of the group 01 enclosure of each node to
be connected a ServerNet II Switch.
•
To replace a SEB in the group 01 enclosure with an MSEB, refer to the guided
procedure or replace action for SEB-to-MSEB replacement. This guided
procedure is supported for the G06.09 RVU and later G-series RVUs.
•
When planning to install a ServerNet Cluster Switch, allow time to replace or move
hardware that is incompatible or located in the slots required for the modular
system expansion boards (MSEBs).
•
Before you install MSEBs in group 01, you must make the following changes if
necessary:
•
Remove any adapters from slot 51 or 52 of the group 01 enclosure
•
Delete any LBU objects or ADAPTER objects configured in either of these
slots from the system configuration database.
•
You can continue to use SEBs in any group enclosure other than group 01.
Required Software
You must install the any required software (see Figure 2-1) on a node before you
connect it to a ServerNet II Switch. Refer to the ServerNet Cluster Manual for more
information about any needed SPRs.
f. Install MSEBs in slots 51 and 52
located in the group 01
enclosure of each node.
Replace SEB or MSEB guided
replacement procedure (TSM)
Replace action of the MSEB (OSM)
g. Update the system configuration
database on each node.
Required System Configuration on
page 2-6
ServerNet Cluster Manual
h. Connecting a node to a
ServerNet Cluster Switch
ServerNet Cluster Manual
Configure ServerNet Node guided
procedure (TSM).
Add Node to ServerNet Cluster action of
the System resource (OSM)
Planning Task Documentation