ServerNet Cluster 6770 Hardware Installation and Support Guide
Contents
ServerNet Cluster 6770 Hardware Installation and Support Guide—522544-002
ii
2. Planning for the ServerNet Cluster
Switch (continued)
2. Planning for the ServerNet Cluster Switch (continued)
Planning for Environmental Requirements 2-15
Planning for Power to the ServerNet Cluster Switch 2-16
AC Power Requirements 2-16
Planning to Respond to Power Failures 2-16
3. Preparing to Install or Replace 6770 ServerNet Cluster Switch
Components
Preparing to Install Switch Components 3-1
Preparing to Replace Switch Components 3-1
Verifying Software and Firmware 3-2
Verifying SP Firmware Version 3-2
Verifying the System Configuration 3-3
Verifying System Operations 3-4
Verifying System Enclosures 3-4
Verifying Processor Status 3-4
Verifying the Status of the Internal ServerNet Fabric 3-4
4. Installing a ServerNet Cluster Switch Enclosure
Stacking a ServerNet Cluster Switch Enclosure 4-1
Preinstalled Components and Cables 4-1
Installing the Enclosure 4-2
Task 1: Planning and Preparation 4-2
Task 2: Preparing the ServerNet Cluster Switch 4-2
Task 3: Completing the Installation 4-3
Configuring the ServerNet Cluster 4-3
5. Installing Switch Components in an EIA Standard Rack
Procedure Summary 5-2
Task 1: Assemble the Required Tools 5-3
Task 2: Verify That You Have All the Parts in the Rack-Mount Kit 5-3
Task 3: Install the Cage Nuts 5-4
Task 4: Install the Rails and Cable-Management Assembly 5-6
Task 4a: Install the UPS Rails 5-6
Task 4b: Install the Cable-Management Tray 5-6
Task 4c: Install the Cable-Management Assembly 5-7
Task 4d: Install the ServerNet II Switch Slide Rails 5-7
Task 5: Install the UPS 5-8
Task 6: Install the AC Transfer Switch 5-8