5. Installing Switch Components in an EIA Standard
Rack (continued)
5. Installing Switch Components in an EIA Standard
Rack (continued)
Task 7: Install the ServerNet II Switch Into the Rack 5-8
Task 8: Connect and Route the Cables and Cords 5-9
Task 9: Power On the Components 5-9
6. Connecting the ServerNet Fiber-Optic Cables
Labeling the Cables 6-1
Routing and Connecting the Cables 6-3
7. Powering On and Powering Off a ServerNet Cluster Switch
Powering On a ServerNet Cluster Switch 7-2
Connecting to the Remote EPO Port, if Required 7-3
Connecting an AC Transfer Switch to AC Power 7-3
Powering On a UPS 7-4
Powering On a ServerNet II Switch 7-5
Powering Off a ServerNet Cluster Switch 7-6
Powering Off a ServerNet II Switch 7-6
Disconnecting the AC Power Cords 7-7
8. Troubleshooting
Determining the Cause of a Problem 8-1
Monitoring a ServerNet Cluster Switch 8-2
Using OSM or TSM to Monitor a ServerNet Cluster Switch 8-2
Monitoring a ServerNet II Switch 8-6
Monitoring a UPS 8-10
Monitoring an AC Transfer Switch 8-16
Verifying Proper Operation
8-18
Verifying the AC Power
8-18
Verifying the Fabric LED on a ServerNet II Switch 8-19
Verifying the Connection Between a ServerNet II Switch and a Node 8-20
Verifying the Connection Between ServerNet II Switches 8-20
Recovery Procedures 8-22
Recovery Procedures for the UPS 8-22
Recovery Procedures for the ServerNet II Switch 8-23