ServerNet Cluster 6770 Hardware Installation and Support Guide
Contents
ServerNet Cluster 6770 Hardware Installation and Support Guide—522544-002
iv
A. Part Numbers
A. Part Numbers
B. Electrostatic Discharge (ESD) Guidelines
C. Firmware Notes
Required SPRs C-2
Checking the Cluster Switch Firmware and Configuration Versions C-5
Updating the Firmware and Configuration C-7
Safety and Compliance
Index
Figures
Figure 1-1. Eight-Node ServerNet Cluster 1-2
Figure 1-2. 16-Node ServerNet Cluster 1-3
Figure 1-3. 24-Node ServerNet Cluster 1-4
Figure 1-4. MSEB Connections to the ServerNet II Switches 1-5
Figure 1-5. Components in a ServerNet Cluster Switch Enclosure 1-6
Figure 1-6. Side and Back of ServerNet II Switch 1-8
Figure 1-7. ServerNet II Switch 1-8
Figure 1-8. ServerNet II Switch PICs 1-9
Figure 1-9. AC/DC Power Supply of the ServerNet II Switch 1-10
Figure 1-10. Rear Panel of the UPS (North American Version) 1-11
Figure 1-11. Power Outlet on UPS (North American Version) 1-11
Figure 1-12. Rear Panel of UPS (International Version) 1-12
Figure 1-13. Logical Diagram of Connections 1-13
Figure 1-14.
Ports 8 Through 11 of a ServerNet II Switch 1-14
Figure 2-1.
ServerNet Node Numbers Using a Four-Lane Link 2-8
Figure 2-2. ServerNet Node Numbers Using Two-Lane Links 2-9
Figure 2-3. Stacking ServerNet Cluster Switch Enclosures 2-11
Figure 2-4. Maximum Distance Between Nodes With One ServerNet II Switch Per
Fabric 2-13
Figure 2-5. Maximum Distance Between Nodes With a One Kilometer Link Between
Switches 2-14
Figure 3-1. Kernel Subsystem Generic Process Configuration Example 3-3
Figure 5-1. Locations of Cage Nuts in the Back of Rack 5-4
Figure 5-2. Locations of Cage Nuts in the Front of the Rack 5-5
Figure 5-3. Rear Panel of the UPS 5-9
Figure 6-1. Labeling Fiber-Optic ServerNet Cables 6-2