Task 3: Install the Cage Nuts
2. At the front of the rack, install 12 cage nuts in the locations shown in Figure 5-2.
Figure 5-2. Locations of Cage Nuts in the Front of the Rack
Cage Nuts for
Blank Panels
Cage Nuts for
ServerNet II
Switch Rail
Cage Nuts for
Blank Panel
Cage Nuts for
AC Transfer
Switch