7 Powering On and Powering Off
a ServerNet Cluster Switch
This section includes these topics:
Powering On a ServerNet Cluster Switch on page 7-2
Connecting to the Remote EPO Port, if Required on page 7-3
Connecting an AC Transfer Switch to AC Power on page 7-3
Powering On a UPS on page 7-4
Powering On a ServerNet II Switch on page 7-5
Powering Off a ServerNet Cluster Switch on page 7-6
Powering Off a ServerNet II Switch on page 7-6
Disconnecting the AC Power Cords on page 7-7