ServerNet Cluster 6780 Planning and Installation Guide (G06.24+, H06.03+)
Contents
ServerNet Cluster 6780 Planning and Installation Guide—527301-004
x
Figures (continued)
Figures (continued)
Figure C-1. Using ESD Protection When Servicing CRUs C-2
Figure G-1. Possible Long-Distance Configuration G-1
Tables
Table 1-1. Cluster Switch Comparison 1-3
Table 1-2. Number of Layers and Zones Supported 1-4
Table 1-3. Software Requirements for NonStop S-Series Servers 1-8
Table 1-4. Expand Profiles Required 1-9
Table 1-5. 6780 Switches Required for the Layered Topology 1-10
Table 1-6. NonStop S-Series Server Components Required for Clustering 1-10
Table 2-1. Numeric Selector Settings 2-3
Table 2-2. Group Numbers 2-4
Table 2-3. Switch Components in Front 2-5
Table 2-4. 6780 Switch PICs 2-6
Table 2-5. 6780 Switch Port Numbers Supported 2-8
Table 2-6. Router Connections in a 6780 Switch 2-9
Table 2-7. Logic Board Buttons 2-11
Table 2-8. Logic Board LCD 2-12
Table 2-9. Router Connections 2-13
Table 2-10. Firmware File Name 2-16
Table 2-11. Configuration File Names 2-16
Table 2-12. FPGA File Names 2-16
Table 3-1. Planning Checklist 3-2
Table 3-2. Number of Layers and Zones 3-9
Table 3-3. Number of 6780 Switches Required 3-9
Table 3-4. PICs in 6780 Switch 3-10
Table 3-5. 6780 Switch Settings 3-11
Table 3-6. Dimensions of an HP 10642 Rack 3-12
Table 3-7. 6780 Switch Power Requirements 3-13
Table 3-8. PDUs Required 3-13
Table 3-9. Cables Required for Clustering 3-16
Table 3-10. Number of Cables Required for Clustering 3-16
Table 3-11. Type and Length of Cables Required for Clustering 3-17
Table 3-12. Node Number Assignments for the Layered Topology 3-18
Table 3-13. Number of Line-Handler Processes Required 3-20
Table 4-1. Task Summary for Preparing a System 4-2
Table 4-2. Minimum NonStop S-Series Server Software VPROC Versions 4-3
Table 6-1. Layer Cable Connections (Zone 1) 6-8