ServerNet Cluster 6780 Planning and Installation Guide (G06.24+, H06.03+)

ServerNet Cluster Overview
ServerNet Cluster 6780 Planning and Installation Guide527301-004
1-11
Fiber-Optic Cables
Fiber-Optic Cables
For more information, refer to Task 7: Plan for the Fiber-Optic Cables on page 3-15.
Modular
ServerNet
expansion
boards
(MSEBs)
4 to 128 2 (one per
external
fabric)
The MSEBs must be installed in slot 51
and slot 52 of the group 01 system
enclosure. MSEBs in any other system
enclosure cannot be used for
connections to the cluster switches.
NNA PICs
installed in
MSEBs
4 to 128 2 (one per
each
MSEB)
Two NNA PICs are required for each
NonStop S-series server (one per
external fabric). MSEBs in group 01,
slots 51 and 52 must contain an SMF
NNA PIC in port 6. Other ports must
contain the appropriate PICs to enable
connectivity to the SEBs or MSEBs to
which they connect.
Table 1-6. NonStop S-Series Server Components Required for
Clustering (page 2 of 2)
Hardware
Component
Required
for
Layered
Topology
Required
for each
node Notes