ServerNet Cluster 6780 Planning and Installation Guide (G06.24+, H06.03+)

Contents
ServerNet Cluster 6780 Planning and Installation Guide527301-004
v
9. Changing a ServerNet Cluster
Checking the Operation of Each Switch 8-4 (continued)
Checking the Globally Unique ID (GUID) 8-7
Checking for a Mixed Globally Unique ID (GUID) 8-8
Checking the Fiber-Optic Cable Connections to the Switch Port 8-8
Checking the Switch Configuration, Firmware, and FPGA Images 8-9
Checking the Operation of Each Node 8-11
Checking the Service Processor (SP) Firmware 8-11
Checking That Automatic Line-Handler Generation Is Enabled 8-12
Checking the ServerNet Node Numbers 8-12
Checking MSGMON, SANMAN, and SNETMON 8-13
Checking for Alarms on Each Node 8-14
Checking the ServerNet Cluster Subsystem 8-14
Checking That the ServerNet Node Numbers Are Consistent 8-15
Checking Communications Between a Local Node and a Switch 8-15
Checking Communications With a Remote Node 8-16
Checking the Internal ServerNet X and Y Fabrics 8-17
Checking the Operation of Expand Processes and Lines 8-18
Checking $NCP and $ZEXP 8-18
Checking the Status of Expand-Over-ServerNet Line-Handler Processes 8-18
Checking the Status of an Expand-Over-ServerNet Line 8-19
9. Changing a ServerNet Cluster
OSM Actions 9-2
Update Topology Action 9-2
Add Node to ServerNet Cluster Action 9-2
Removing a Node From a ServerNet Cluster 9-3
Removing Switches From a ServerNet Cluster 9-4
Adding a Node to a ServerNet Cluster 9-5
Task 1: Prepare to Add the Node 9-5
Task 2: Add the Node to the ServerNet Cluster 9-5
Task 3: Connect the Cables 9-6
Task 4: Start the ServerNet Cluster Subsystem 9-6
Task 5: Start the Expand-Over-ServerNet Lines 9-6
Task 6: Check Operations 9-7
Adding a Switch Layer to a ServerNet Cluster 9-8
Task 1: Prepare to Add the Switches 9-8
Task 2: Connect the Cables Between Layers 9-8
Task 3: Check the New Switches 9-8
Task 4: Connect the Cables Between Zones 9-8