ServerNet Cluster 6780 Planning and Installation Guide (G06.24+, H06.03+)

Contents
ServerNet Cluster 6780 Planning and Installation Guide527301-004
vi
10. Troubleshooting
Adding a Switch Layer to a ServerNet Cluster 9-8 (continued)
Task 5: Resume Normal Operations 9-9
Adding a Switch Zone to a ServerNet Cluster 9-9
Task 1: Prepare to Add the Switches 9-9
Task 2: Connect the Cables Between Layers 9-10
Task 3: Check Operations 9-10
Task 4: Disconnect the Cables Between Zones 9-10
Task 5: Connect the Cables Between Zones 9-11
Task 6: Check Operations 9-12
Task 7: Connect the Additional Nodes 9-12
Task 8: Check Operations 9-12
Task 9: Repeat Tasks 2 Through 8 for the Other Fabric 9-12
Task 10: Reenable OSM Alarms 9-13
Moving a Node 9-13
Alerts 9-13
Moving the Cable Connected Between a Node and 6780 Switch 9-13
Changing the Hardware in a Node Connected to a ServerNet Cluster 9-14
Expanding or Reducing a NonStop S-Series Server 9-14
10. Troubleshooting
Symptoms 10-2
Green Power-On LED on a Switch Is Not Lit 10-2
Green Link-Alive LED Is Not Lit 10-2
Yellow Fault LED on a Switch Is Lit 10-3
Yellow Fault LED on a Switch Is Blinking 10-3
An OSM Alarm on the External Fabric Is Generated 10-3
ServerNet Node Numbers Are Not Consistent 10-4
ServerNet Remote Node Name Does Not Display 10-4
Recovery Operations 10-5
Enabling Automatic Expand-Over-ServerNet Line-Handler Generation 10-5
Reseating a Fiber-Optic Cable 10-5
Correcting a Mixed Globally Unique ID (GUID) 10-6
Restoring Connectivity to a Node 10-7
Switching the SANMAN Primary and Backup Processes 10-8
Switching the SNETMON Primary and Backup Processes 10-8
Configuring the Expand-Over-ServerNet Line-Handler Processes and Lines 10-9
Starting Required Processes and Subsystems 10-9