ServerNet Cluster 6780 Planning and Installation Guide (G06.24+, H06.03+)
Contents
ServerNet Cluster 6780 Planning and Installation Guide—527301-004
vii
11. Starting and Stopping ServerNet Cluster
Processes and Subsystems
Fallback Procedures 10-10
Fallback to a Previous RVU 10-10
Fallback to Previous SPRs 10-10
11. Starting and Stopping ServerNet Cluster Processes and
Subsystems
Stopping the ServerNet Cluster Subsystem 11-2
Stopping Expand-Over-ServerNet Lines 11-3
Starting the ServerNet Cluster Subsystem 11-4
Starting the External ServerNet Fabric 11-4
Starting SANMAN 11-4
Starting MSGMON 11-5
Starting SNETMON 11-5
Starting the Expand-Over-ServerNet Line-Handler Processes and Lines 11-5
A. Part Numbers
Service Classifications A-1
Switch Rack A-2
Switch A-2
Switch Components A-3
Uninterruptible Power Supply (UPS) A-3
Power Distribution Unit (PDU) A-4
Power Cords A-4
Power Cords for Connecting a 6780 Switch to a PDU or UPS A-4
Power Cords for Connecting a 6780 Switch Directly to an External Power
Source A-5
Fiber-Optic Cables A-7
ESD Protection Kit A-7
Modular ServerNet Expansion Board (MSEB) A-7
B. Blank Planning Forms
Switch Planning Form B-2
Migrating Nodes Form B-3
ServerNet Node Number Forms B-4
Firmware, Configuration, and FPGA Planning Form B-8
Moving Node Cables Form B-8
Expand Lines Form B-9