ServerNet Cluster 6780 Planning and Installation Guide (G06.28+, H06.05+)

Table Of Contents
ServerNet Cluster 6780 Planning and Installation Guide527301-005
9-1
9 Changing a ServerNet Cluster
This section provides procedures to make changes to an already-installed ServerNet
Cluster or a node in a cluster.
OSM Actions 9-2
Update Topology Action 9-2
Add Node to ServerNet Cluster Action 9-2
Removing a Node From a ServerNet Cluster 9-3
Removing Switches From a ServerNet Cluster 9-4
Adding a Node to a ServerNet Cluster 9-5
Task 1: Prepare to Add the Node 9-5
Task 2: Add the Node to the ServerNet Cluster 9-5
Task 3: Connect the Cables 9-6
Task 4: Start the ServerNet Cluster Subsystem 9-6
Task 5: Start the Expand-Over-ServerNet Lines 9-6
Task 6: Check Operations 9-7
Adding a Switch Layer to a ServerNet Cluster 9-8
Task 1: Prepare to Add the Switches 9-8
Task 2: Connect the Cables Between Layers 9-8
Task 3: Check the New Switches 9-8
Task 4: Connect the Cables Between Zones 9-8
Task 5: Resume Normal Operations 9-9
Adding a Switch Zone to a ServerNet Cluster 9-9
Task 1: Prepare to Add the Switches 9-9
Task 2: Connect the Cables Between Layers 9-10
Task 3: Check Operations 9-10
Task 4: Disconnect the Cables Between Zones 9-10
Task 5: Connect the Cables Between Zones
9-11
Task 6: Check Operations
9-12
Task 7: Connect the Additional Nodes 9-12
Task 8: Check Operations 9-12
Task 9: Repeat Tasks 2 Through 8 for the Other Fabric 9-12
Task 10: Reenable OSM Alarms 9-13
Moving a Node 9-13
Alerts 9-13
Moving the Cable Connected Between a Node and 6780 Switch 9-13
Changing the Hardware in a Node Connected to a ServerNet Cluster 9-14
Expanding or Reducing a NonStop S-Series Server 9-14