- 3 Planning for Installation and Migration
- Planning Checklist
- Software Installation Planning
- Hardware Installation and Migration Planning
- Task 1: Plan for the ServerNet Nodes
- Task 2: Plan for the System Consoles
- Task 3: Plan for the 6780 Switches
- Task 4: Plan for the Racks
- Task 5: Plan for the Power Requirements
- Task 6: Plan the Location of the Hardware
- Task 7: Plan for the Fiber-Optic Cables
- Task 8: Plan to Migrate the ServerNet Nodes From 6770 Switches
- Task 9: Plan the ServerNet Node Numbers
- Task 10: Plan the Expand-Over-ServerNet Lines
- Migration Examples
- 4 Preparing a System for Installation or Migration
- 5 Installing 6780 Switches
- 6 Connecting the Fiber-Optic Cables
- Summary of Tasks
- Handling the Fiber-Optic Cables
- Connecting the Layer Cables
- Connecting the Zone Cables
- Connecting the Cables Between a Node and a 6780 Switch
- Alerts
- Task 1: Double-Check the Required Software and Hardware
- Task 2: Label the Cables That Connect to the Node
- Task 3: Inspect the Cables
- Task 4: Connect a Cable to the Switch
- Task 5: Connect a Cable to the Node
- Task 6: Check the Link-Alive LEDs
- Task 7: Check Operations
- Task 8: Finish Connecting the Fiber-Optic Cables
- Routing the Fiber-Optic Cables
- 7 Configuring Expand-Over-ServerNet Lines
- Using Automatic Line-Handler Generation
- Using the OSM Service Connection
- Using SCF
- Rule 1: Configure the Primary and Backup Line-Handler Processes in Different Processor Enclosures
- Rule 2: For Nodes With 6 or More Processors, Avoid Configuring the Line-Handler Processes in Proc...
- Rule 3: For Nodes With More Than 10 Processors, Avoid Configuring the Line-Handler Processes in P...
- Expand-Over-ServerNet Line-Handler Process Example
- 8 Checking Operations
- Checking the Operation of the ServerNet Cluster
- Checking the Operation of Each Switch
- Checking the Power to Each Switch
- Checking the Switch Components
- Checking the Numeric Selector Setting
- Checking the Globally Unique ID (GUID)
- Checking for a Mixed Globally Unique ID (GUID)
- Checking the Fiber-Optic Cable Connections to the Switch Port
- Checking the Switch Configuration, Firmware, and FPGA Images
- Checking the Operation of Each Node
- Checking the Service Processor (SP) Firmware
- Checking That Automatic Line-Handler Generation Is Enabled
- Checking the ServerNet Node Numbers
- Checking MSGMON, SANMAN, and SNETMON
- Checking for Alarms on Each Node
- Checking the ServerNet Cluster Subsystem
- Checking That the ServerNet Node Numbers Are Consistent
- Checking Communications Between a Local Node and a Switch
- Checking Communications With a Remote Node
- Checking the Internal ServerNet X and Y Fabrics
- Checking the Operation of Expand Processes and Lines
- 9 Changing a ServerNet Cluster
- OSM Actions
- Removing a Node From a ServerNet Cluster
- Removing Switches From a ServerNet Cluster
- Adding a Node to a ServerNet Cluster
- Adding a Switch Layer to a ServerNet Cluster
- Adding a Switch Zone to a ServerNet Cluster
- Task 1: Prepare to Add the Switches
- Task 2: Connect the Cables Between Layers
- Task 3: Check Operations
- Task 4: Disconnect the Cables Between Zones
- Task 5: Connect the Cables Between Zones
- Task 6: Check Operations
- Task 7: Connect the Additional Nodes
- Task 8: Check Operations
- Task 9: Repeat Tasks 2 Through 8 for the Other Fabric
- Task 10: Reenable OSM Alarms
- Moving a Node
- Changing the Hardware in a Node Connected to a ServerNet Cluster
- 10 Troubleshooting
- Symptoms
- Recovery Operations
- Enabling Automatic Expand-Over-ServerNet Line-Handler Generation
- Reseating a Fiber-Optic Cable
- Correcting a Mixed Globally Unique ID (GUID)
- Restoring Connectivity to a Node
- Switching the SANMAN Primary and Backup Processes
- Switching the SNETMON Primary and Backup Processes
- Configuring the Expand-Over-ServerNet Line-Handler Processes and Lines
- Starting Required Processes and Subsystems
- Fallback Procedures
- 11 Starting and Stopping ServerNet Cluster Processes and Subsystems
- A Part Numbers
- B Blank Planning Forms
- C ESD Guidelines
- D Specifications
- E Configuring MSGMON, SANMAN, and SNETMON
- F Updating the 6780 Switch Logic Board Firmware, Configuration, and FPGA Images
- G Using the Long-Distance Option
- Safety and Compliance
- Glossary
- Index

Glossary
ServerNet Cluster 6780 Planning and Installation Guide—527301-005
Glossary-26
SMN
SMN. The mnemonic name for the external system area network manager process
(SANMAN). See system area network manager process (SANMAN).
SNETMON. See ServerNet cluster monitor process (SNETMON).
soft reset. An action performed on a cluster switch that restarts the firmware on the switch
but does not interfere with ServerNet passthrough data traffic.
software product revision (SPR). A method of releasing incremental software updates on
NonStop systems. An SPR can include one or more corrections to code, or it can
contain code that adds new function to a software product.
source ServerNet ID (SID). A field in the ServerNet packet header indicating the source of
the packet.
SP. See service processor (SP).
split-star topology. A network topology that uses up to two cluster switches for each
external fabric. External routing is implemented between the two starred halves of a
ServerNet cluster. (A starred half consists of up to eight nodes attached to one set of
cluster switches.) The starred segments are joined by four-lane links. Introduced with
the G06.12 RVU of the ServerNet cluster product, the split-star topology supports up to
16 nodes. A split-star topology requires HP NonStop Cluster Switches (model 6770).
See also star topology and tri-star topology.
SPR. See software product revision (SPR).
star group. One set of X and Y cluster switches and the ServerNet nodes (up to eight) that
are connected to them. A star group can be thought of as a segment of a split-star or
tri-star topology. A split-star topology can contain up to two star groups. A tri-star
topology can contain up to three star groups.
star topologies. The network topologies for ServerNet clusters using the HP NonStop
Cluster Switch (model 6770). The three star topologies are the star topology
, the split-
star topology, and the tri-star topology. See also layered topology.
star topology. A network topology in which all nodes are connected to a central hub
(cluster switch). Each node has its own connection to the network, so a break in the
connection does not affect other nodes in the network. In a ServerNet cluster, a star
topology requires one cluster switch for each external fabric and can support up to
eight nodes. A star topology requires HP NonStop Cluster Switches (model 6770).
See also split-star topology and tri-star topology.
state. In the Subsystem Control Facility (SCF), one of the generally defined possible
conditions of an object with respect to the management of that object. Examples of
states are DEFINED, STARTED, and STOPPED.
STFs. See super time factors (STFs).