ServerNet Cluster 6780 Planning and Installation Guide (G06.28+, H06.05+)

Table Of Contents
Contents
ServerNet Cluster 6780 Planning and Installation Guide527301-005
ii
2. ServerNet Cluster Hardware
Description (continued)
2. ServerNet Cluster Hardware Description (continued)
6780 Switch 2-2
Identifying a 6780 Switch 2-2
Identifying Components in a 6780 Switch 2-5
Connections Between External Ports and Internal Routers 2-9
Midplane 2-10
Logic Board 2-10
Firmware, Configuration, and FPGA Images 2-16
Logic Board Firmware Image 2-16
Logic Board Configuration Image 2-16
Logic Board FPGA Image 2-16
Power Components 2-17
Power Distribution Unit (PDU) 2-17
Uninterruptible Power Supply (UPS) 2-17
Rack 2-17
Nodes 2-18
Identifying a Node 2-18
ServerNet Node Numbers 2-18
NonStop S-Series Servers 2-20
Light-Emitting Diodes (LEDs) 2-23
LED Types 2-23
LEDs on the 6780 Switch 2-24
LEDs on MSEBs in NonStop S-Series Servers 2-25
Links 2-26
Fiber-Optic Cables 2-26
Electric Code Regulations for Fiber-Optic Cables 2-27
Fiber 2-27
Connectors 2-28
3. Planning for Installation and Migration
Planning Checklist 3-2
Software Installation Planning 3-5
Hardware Installation and Migration Planning 3-5
Task 1: Plan for the ServerNet Nodes 3-5
Task 2: Plan for the System Consoles 3-6
Task 3: Plan for the 6780 Switches 3-8
Task 4: Plan for the Racks 3-12
Task 5: Plan for the Power Requirements 3-13
Task 6: Plan the Location of the Hardware 3-14