ServerNet Cluster 6780 Planning and Installation Guide (G06.28+, H06.05+)

Table Of Contents
Contents
ServerNet Cluster 6780 Planning and Installation Guide527301-005
iv
6. Connecting the Fiber-Optic Cables (continued)
6. Connecting the Fiber-Optic Cables (continued)
Connecting the Zone Cables 6-10
Zone Cable Connections 6-10
Connect the Zone Cables 6-17
Connecting the Cables Between a Node and a 6780 Switch 6-18
Alerts 6-18
Task 1: Double-Check the Required Software and Hardware 6-18
Task 2: Label the Cables That Connect to the Node 6-18
Task 3: Inspect the Cables 6-19
Task 4: Connect a Cable to the Switch 6-19
Task 5: Connect a Cable to the Node 6-20
Task 6: Check the Link-Alive LEDs 6-22
Task 7: Check Operations 6-22
Task 8: Finish Connecting the Fiber-Optic Cables 6-22
Routing the Fiber-Optic Cables 6-22
7. Configuring Expand-Over-ServerNet Lines
Using Automatic Line-Handler Generation 7-2
Using the OSM Service Connection 7-2
Add Node to ServerNet Cluster Action 7-2
Using SCF 7-2
Rule 1: Configure the Primary and Backup Line-Handler Processes in Different
Processor Enclosures 7-3
Rule 2: For Nodes With 6 or More Processors, Avoid Configuring the Line-Handler
Processes in Processors 0 and 1 7-3
Rule 3: For Nodes With More Than 10 Processors, Avoid Configuring the Line-
Handler Processes in Processors 10 Through 15 7-3
Expand-Over-ServerNet Line-Handler Process Example
7-3
8. Checking Operations
Checking the Operation of the ServerNet Cluster 8-2
Checking for OSM ServerNet Cluster Alarms 8-2
Checking the External Fabric for All Nodes 8-3
Checking for Problems Between Nodes 8-4
Checking the Operation of Each Switch 8-4
Checking the Power to Each Switch 8-5
Checking the Switch Components 8-5
Checking the Numeric Selector Setting 8-6
Checking the Globally Unique ID (GUID) 8-7
Checking for a Mixed Globally Unique ID (GUID) 8-8