Planning for Installation and Migration
ServerNet Cluster 6780 Planning and Installation Guide527301-005
3-18
Task 8: Plan to Migrate the ServerNet Nodes From
6770 Switches
Task 8: Plan to Migrate the ServerNet Nodes From 6770
Switches
Skip this step if you are not migrating from a ServerNet cluster with 6770 switches.
1. Determine the current ServerNet node numbers for each node using either SCF or
OSM. Refer to Checking the ServerNet Node Numbers on page 8-12.
2. Using the Migrating Nodes Form on page B-3:
a. Record the system name that corresponds to each ServerNet node number in
the current ServerNet cluster.
b. Determine the corresponding 6780 switch fabric, layer, zone, PIC slot, and port
number required to maintain the same ServerNet node number. You need this
information when connecting the cables between the 6780 switch and the
node.
Task 9: Plan the ServerNet Node Numbers
1. Using Table 3-12, determine which 6780 switch is associated with each ServerNet
node number.
2. Using the ServerNet Node Number Forms on page B-4, record the names of each
node that you plan to connect to each switch.
Table 3-12. Node Number Assignments for the Layered Topology
ServerNet Nodes 6780 Switch
1 through 8 X11/Y11
9 through 16 X21/Y21
17 through 24 X12/Y12
25 through 32 X22/Y22
33 through 40 X13/Y13
41 through 48 X23/Y23
49 through 56 X14/Y14
57 through 64 X24/Y24
65 through 72 X31/Y31
73 through 80 X32/Y32
81 through 88 X33/Y33
89 through 96 X34/Y34