Preparing a System for Installation
or Migration
This section provides instructions to prepare both systems that are not currently in a
ServerNet cluster and existing ServerNet nodes currently connected to 6770 switches.
You must perform all the required tasks before adding or migrating the node to a
ServerNet cluster using 6780 switches.
Task 1: Complete the Planning Checklist 4-2
Task 2: Install the Servers 4-2
Task 3: Check and Install the Required Software 4-3
Checking the Required Software 4-3
Installing the Client Software 4-4
Installing the Server Software 4-4
Task 4: Check Operations and the Required Processes 4-5
Migrating From a ServerNet Cluster Using 6770 Switches 4-5
Installing New ServerNet Nodes 4-5
Task 5: Check and Install the Hardware 4-6
Checking NonStop S-series Servers 4-6