ServerNet Cluster 6780 Planning and Installation Guide (G06.29+, H06.06+, J06.03+)
Contents
ServerNet Cluster 6780 Planning and Installation Guide—527301-008
x
Tables
Table 3-5. 6780 Switch Settings 3-11
Table 3-6. 6780 Switch Power Requirements 3-13
Table 3-7. PDUs Required 3-13
Table 3-8. Cables Required for Clustering 3-16
Table 3-9. Number of Cables Required for Clustering 3-16
Table 3-10. Type and Length of Cables Required for Clustering 3-17
Table 3-11. Node Number Assignments for the Layered Topology 3-18
Table 3-12. Number of Line-Handler Processes Required 3-20
Table 4-1. Task Summary for Preparing a System 4-2
Table 4-2. Minimum NonStop S-Series Server Software VPROC Versions 4-3
Table 6-1. Layer Cable Connections (Zone 1) 6-8
Table 6-2. X Fabric Connections Between Two Zones 6-12
Table 6-3. Y Fabric Connections Between Two Zones 6-13
Table 6-4. X Fabric Connections for a Three-Zone ServerNet Cluster 6-15
Table 6-5. Y Fabric Connections for a Three-Zone ServerNet Cluster 6-16
Table 8-1. Numeric Selector Setting 8-6
Table 8-2. SCF Display of VPROCs 8-10
Table 8-3. OSM Display of VPROCs 8-10
Table 8-4. Scope of Node Connectivity ServerNet Path Test 8-16
Table 9-1. Disconnecting the Fiber-Optic Cables From Zone 1 9-11
Table 9-2. Disconnecting the Fiber-Optic Cables Zone 2 9-11
Table 10-1. Correcting a Mixed GUID 10-6
Table B-1. Planning for Switches B-2
Table B-2. Planning to Migrate Nodes to a Layered Topology B-3
Table B-3. First Layer B-4
Table B-4. Second Layer B-5
Table B-5. Third Layer B-6
Table B-6.
Fourth Layer B-7
Table B-7.
Switch Logic Board Downloadable Images B-8
Table D-1. 6780 Switch Specification D-1
Table D-2. SMF Fiber-Optic Requirements D-2
Table D-3. SMF Cable Requirements D-2
Table D-4. MMF Fiber-Optic Requirements D-3
Table G-1. Software That Supports the Long-Distance Option in Two-Zone
Topologies G-4
Table G-2. Software That Supports the Long-Distance Option in Three-Zone
Topologies G-5
Table G-3. Numeric Selector Settings for the Long-Distance Option G-8