ServerNet Cluster Manual
Upgrading a ServerNet Cluster
ServerNet Cluster Manual—520575-003
4-13
Task 4: Select an Upgrade Path
Table 4-10 lists the supported upgrade paths for clusters using the star topology.
Table 4-10. Supported Upgrade Paths for Clusters Using the Star Topology
A star topology 
using . . .
Can be upgraded to . . .
To upgrade . . .Topology
Cluster 
Switches 
Per Fabric
One cluster switch 
per fabric
Star 1 Refer to one of the following:
•
Upgrading Software to Obtain 
G06.12 Functionality on page 4-17
•
Upgrading Software to Obtain 
G06.14 Functionality on page 4-34
These upgrade paths upgrade software 
from release 1 (G06.09) or release 2 
(G06.12) to release 2 or release 3 
(G06.14 or superseding SPRs) without 
changing the topology or the number of 
cluster switches per fabric.
Split-star 1 Refer to one of the following:
•
Upgrading Software to Obtain 
G06.12 Functionality on page 4-17
•
Upgrading Software to Obtain 
G06.14 Functionality on page 4-34
2 1. Upgrade the cluster, referring to 
Upgrading Software to Obtain 
G06.12 Functionality on page 4-17.
2. Merge the cluster with another 
cluster using the star topology. 
Refer to Merging Clusters to Create 
a Split-Star Topology on page 4-54.
Tri-star 1 Refer to Upgrading Software to Obtain 
G06.14 Functionality on page 4-34.
2 or 3 1. Upgrade the cluster, referring to 
Upgrading Software to Obtain 
G06.14 Functionality on page 4-34.
2. Merge the cluster with another 
cluster using the star topology. 
Refer to Merging Clusters to Create 
a Tri-Star Topology on page 4-68.










