ServerNet Cluster Manual

Upgrading a ServerNet Cluster
ServerNet Cluster Manual520575-003
4-55
Example: Merging Two Star Topologies to Create a
Split-Star Topology
Figure 4-5 shows the merging of two three-node ServerNet clusters into a split-star
topology that can support up to 16 nodes. The cluster switches for one of the three-
node clusters are reconfigured as X2 and Y2 in order to construct the new topology. In
addition, the merged cluster uses 1-kilometer four-lane links. Therefore, all nodes must
run G06.11 or a later G-series RVU.
Table 4-16. Upgrade Summary: Upgrading Software to Create a Split-Star
Topology (G06.12 Functionality)
Before the Upgrade After the Upgrade
Max. Nodes Supported 816
Cluster Switches Per
Fabric
12
NonStop Kernel
Operating System
Release
G06.09, G06.10, or G06.11 If the four-lane link is less
than 80 meters, the cluster
can contain G06.09, G06.10,
G06.11, or G06.12 nodes.
If the four-lane link is more
than 80 meters, G06.11 or a
later G-series RVU is
required on all nodes.
ServerNet II Switch
Firmware
Empty firmware files (T0569)
or T0569AAA
T0569AAB (or superseding)
SANMAN Version T0502 or T0502AAA (G06.09) T0502AAE (or superseding)
TSM Server Version T7945AAS (G06.09),
T7945AAT (G06.10), or
T7945AAV (G06.11)
T7945AAW (or superseding)
TSM Client Version 10.0 (G06.09),
2000A (G06.10), or
2001A (G06.11)
2001B (G06.12)
or a later client version
SNETMON/MSGMON
Version
T0294 (G06.09 or G06.10), or
T0294AAB (G06.11)
T0294*
(G06.09 or G06.10),
T0294AAB (G06.11), or
T0294AAE (G06.12)
Service Processor (SP)
Version
T1089AAX (G06.09) or
T1089AAZ (G06.09, G06.10,
or G06.11)
T1089ABB
(or superseding)
SCF T9082ACN T9082ACQ
(or superseding)
*T0294AAA (a Class D SPR) can also be applied to G06.09 and G06.10.