Floor Space for Servicing of Cluster Switches
You must plan floor space for the cluster switches that includes service space in front 
of and behind the switch enclosure (or 19-inch rack). Table 2-6 shows the dimensions 
of the switch enclosure. The total weight of the switch enclosure and its components is 
180 lbs. 
The ServerNet II Switch subcomponent of the cluster switch is installed on slide rails. 
When pulled out for servicing (see Figure 2-9), the ServerNet II Switch extends 
approximately 24 inches in front of the enclosure. You must allow enough service 
clearance in front of the switch enclosure so that the ServerNet II Switch can be fully 
extended—and removed, if necessary—for servicing.
Table 2-6. Switch Enclosure Dimensions
Measurement
Dimension Description Example Inches centimeters
Height 
(including 
casters)
1 switch enclosure  20.5 52.0
1 stackable switch 
enclosure and 1 base 
enclosure
54.6 138.7
Width Enclosure including two cable channels
Enclosure without cable channels
Enclosure with cable channels
Enclosure without cable channels
Appearance side
Service side
Enclosure
Enclosure with clearance
23 58
19 48.3
Depth 30.75 73.8
25.75 65.4
Clearance 36 91.5
30 77
Footprint 5 ft
2
0.47 m
2
13.2 ft
2
1.23 m
2