ServerNet Nomadic Disk User's Guide
Switchovers
ServerNet Nomadic Disk User’s Guide—425485-001
5-2
Preparing for a Switchover
After a switchover, operations continue on the backup node following a planned or 
unplanned outage of the primary node: 
•
A switchover is planned when the primary node is halted to perform significant 
maintenance tasks or software upgrades. 
•
A switchover is unplanned when a primary node fails. 
Preparing for a Switchover
•
Review Logically Switching a Database on page 1-5 and  Section 7, Nomadic Disk 
Manager Interface. We strongly recommend that you use the Nomadic Disk 
Manager to both physically and logically switch Nomadic volumes. Note that you 
must log on as the Super ID (255,255) to use the Nomadic Disk Manager.
•
A backup node must be available to do the processing while the primary node is 
unavailable. 
•
A backup node is usually located with remotely mirrored disks (for an example of a 
dual-path configuration see Figure 1-1 on page 1-3). 
Caution. Detailed information on switching a database without using the Nomadic Disk 
Manager is beyond the scope of this manual. If you choose to not use the Nomadic Disk 
Manager, the procedures in this section provide only an overview of the process of switching 
the Nomadic disks from the primary node to its backup node, and might not be applicable in all 
situations. 










