ServerNet/FX Adapter Configuration and Management Manual

Table Of Contents
Managing the ServerNet/FX Adapter Subsystem
ServerNet/FX Adapter Configuration and Management Manual426872-002
3-36
Procedures for Preparing ServerNet/FX Adapters for
PMF CRU Replacement
To start the LBU to the Y ServerNet fabric that was stopped in Task 4 above, issue the
following ServerNet/FX adapter subsystem SCF command:
SCF> START LBU $ZZFOX.#Y
Task 8: Switch back the primary FOX monitor process (optional)
To return the primary FOX monitor process to the processor it was running in before
replacing the PMF CRU, issue the following ServerNet/FX adapter subsystem SCF
command:
SCF> PRIMARY $ZZFOX, n
where n is the processor where the backup process is running.