SNAX Connection Manager (SNAX/CM) Manual
Text Messages
SNAX/CM Messages
B–14 097842 Tandem Computers Incorporated
time-date
LOG (#8):
LINE
line-name
[, PORT
port-name
][,PU
#puname
],
command
COMMAND REJECTED,
RC =
rc-code
, FE =
fe-error
Cause. SNAX/CM issued a connection management operation to SNAX/XF and
received an error (an invalid return code).
Effect. The operation cannot be initiated. The difference between this message and the
message immediately preceding is that SNAX/CM accepted the command and
attempted to issue the connection management operation to SNAX/XF.
Recovery. Check the return code and file-system error number to determine the reason
for the command not being accepted.
time-date
LOG (#9):
LINE
line-name
[, PORT
port-name
][,PU
#puname
],
CALL-OUT COMPLETED, STATUS: CONNECTED,
ALIAS LU
alias-lu-name
, LU COUNT
num
Cause. The call-out operation is completed.
Effect. The line is connected.
Recovery. Informational message only; no corrective action is needed.
time-date
LOG (#10):
INTERNAL ERROR: UNRECOVERABLE BUFFER SHORTAGE
Cause. SNAX/CM is unable to allocate buffer space to continue processing.
Effect. SNAX/CM logs this message and issues an ABEND call. Save both the abend
file and the log file, and contact your Tandem representative.
Recovery. If it was not run as a continuous process, restart SNAX/CM.