SNAX Connection Manager (SNAX/CM) Manual
Text Messages
SNAX/CM Messages
B–20 097842 Tandem Computers Incorporated
time-date
LOG (#25):
LINE
line-name
, PORT
port-name,
PU
#puname,
CALL-IN COMPLETED, STATUS: CONNECTED
ALIAS LU
alias-lu-name
, LU COUNT
num
Cause. The call-in operation is completed.
Effect.
#puname
is the configured name of the connected PU.
alias-lu-name
is a
complete LU name that includes a line name.
Recovery. Informational message only; no corrective action is needed.
time-date
LOG (#26):
LINE
line-name
[,PORT
port-name
],
CALL VALIDATE FAILED, PROCESS
process name
,
RC =
rc-code
, FE =
fe-error
Cause. Call validation failed.
Effect. The effect can be one of the following:
SXCMGR fails to open the validation process.
SXCMGR fails to write to the validation process.
The validation process failed to validate the call string within timeout limits.
The timeout value is either the default 60 seconds or a value set by the user
using a TIMEOUT call.
The validation process rejected the call string.
The validation process returned an incorrectly formatted response.
Recovery. Check the return code and file-system error number to determine the reason
for the command not being accepted.