SNAX/APC Configuration and Management Manual

Trace Analysis Program
SNAX/APC Configuration and Management Manual138787
5-35
Error Version (Trace Format)
resources are already deallocated.” Note that in the trace, all the resource IDs, for
example, have been set to zero.
The other half of the conversation is terminated more gracefully, the IDs still exist.
SNAX/APC sends a negative response to the partner LU, and then sends further
information regarding the error.
==============================================================================
<BOUT> @mucb 850194 seq: 322 05/13/92 11:40:05.85
mucb:
OCB ID: %H0008
LU ID: %H0002; SESSION ID: %H0004
TPI ID: %H0040; CONV ID: %H006F
000CF912 000CF912 00530001 00020004 006F0040
00040000 0008000C D9560000 00105103 00000000
80000000 00000000 00000004
biu: SRPL SEND
SRPL=001B 0000 0000014D 00000000 00000000 0000 0000 0000 000E
RH=8F3040 -RSP FMD FI SDI BCI ECI DR2
08460000 [....]
==============================================================================
<BOUT> @mucb 850074 seq: 355 05/13/92 11:40:06.47
mucb:
OCB ID: %H0008
LU ID: %H0002; SESSION ID: %H0004
TPI ID: %H0040; CONV ID: %H006F
000CF89A 000CF89A 00560001 00020004 006F0040
00040000 0008000C D9560000 00105102 07400000
80000000 00000000 00000007
biu: SRPL SEND
SRPL=001B 0000 0000014D 00000000 00000000 0000 0000 0000 006A
RH=0B8001 REQ FMD FI BCI ECI DR1 CEBI
07070864 000000 [.......]