SWAN 2 Concentrator Installation and Support Guide

Replacing a WAN Backplane Interface Card (BIC)
SWAN 2 Concentrator Installation and Support Guide429593-010
7-7
Verify the Installation of the Replacement WAN BIC
8. Disconnect the grounding clip of your ESD wriststrap from the SWAN 2
concentrator rack.
Verify the Installation of the Replacement WAN BIC
Verify the installation of a replacement WAN BIC by:
Running the loopback connector test using OSM or TSM (see Execute a Loopback
Test on page 4-4).
Making sure no OSM or TSM alarms are present for the WAN BICs associated
CLIP.